MDTA Misc. Suspension Span Bay Bridge Rehabilitation

CONSTRUCTION MANAGEMENT, MARYLAND, STATE, STRUCTURES, TRANSPORTATION, UTILITIES

andy-herron-headshot-01

AREA ENGINEER

ANDY HERRON, CCM, CHST

Overall Project Value (M)

BB-3005

Official Project Title

PROJECT DETAILS

Client:

Maryland Transportation Authority

Client Contact:

Joseph Jachelski
MDTA
8019 Corporate Drive, Suite F
Nottingham, MD 21236
443.790.8973

Location:

Annapolis, MD

Services:

MDTA Misc. Suspension Span Bay Bridge Rehabilitation

MDTA Misc Suspension Span Rehabilitation Featured Image

Project Date: Ongoing

Scope of work for this project includes Eastbound Bridge Rocker Links, Wind Shoes, and Lower Tower Struts.

  1. Replacing existing suspension tower rocker links and pins.
  2. Replacing existing suspension tower wind shoes.
  3. Rehabilitate existing suspension tower lower struts.
  4. Rehabilitate existing Westbound Bridge Suspension Span stringer expansion bearings.
  5. Renovation of the existing Eastbound Bridge navigational lighting system.
  6. Replacing all navigational lighting on the Eastbound William Preston Lane Bridge
  7. Replacing existing conduit, junction boxes, and wiring as required between the transformer assemblies and navigational lights.
  8. The work will be from the west deck girder at Pier 1 to the last navigational lights on Pier 41 as shown on the Plans.

 

TIS Duties for the MDTA Misc. Suspension Span Bay Bridge Rehabilitation

True Inspection Services (TIS) provides Construction Management, Administration, and Inspection Services. TIS also provides a variety of managerial services including ICPM/CPM schedule review, budget management, facilitates monthly progress meetings, holds formal partnering meetings, monthly and quarterly safety inspections, force account tracking, change order processing and mitigation.  Additionally, TIS provides oversight of the quality control inspection program and staff through all phases of construction.

Andy Herron, CCM, CHST

Andy Herron, CCM, CHST

Area Engineer

Mr. Herron is a Certified Construction Manager and is currently overseeing the project management for the MDTA Misc. Suspension Span Bay Bridge Rehabilitation Project. Some of his duties include facilitating formal partnering meetings, CPM schedule review, and project assignments. In addition, he drafts and provides recommendations for Change Orders and Supplemental Agreements. Finally, he manages the construction budget and generates monthly expenditure reports and future cost projections for the Deputy Director of Construction.

Let's Work Together. START TODAY!

LOCATIONS

OHIO

 

605 MIAMI STREET STE 200
URBANA, OH 43078

EASTON TOWN CENTER
4200 REGENT ST STE 200
COLUMBUS, OH 43219

937.521.2645
937.688.1709

MARYLAND

 

539 ROCK SPRING RD
BEL AIR, MD 21014

443.536.6659

KENTUCKY

 

7310 TURFWAY RD, STE 550
FLORENCE, KY 41042

Share This