MDTA Misc. Suspension Span Bay Bridge Rehabilitation
AREA ENGINEER
ANDY HERRON, CCM, CHST
Overall Project Value (M)
BB-3005
Official Project Title
PROJECT DETAILS
Client:
Maryland Transportation Authority
Client Contact:
MDTA
8019 Corporate Drive, Suite F
Nottingham, MD 21236
443.790.8973
Location:
Annapolis, MD
Services:
MDTA Misc. Suspension Span Bay Bridge Rehabilitation
Project Date: Ongoing
Scope of work for this project includes Eastbound Bridge Rocker Links, Wind Shoes, and Lower Tower Struts.
- Replacing existing suspension tower rocker links and pins.
- Replacing existing suspension tower wind shoes.
- Rehabilitate existing suspension tower lower struts.
- Rehabilitate existing Westbound Bridge Suspension Span stringer expansion bearings.
- Renovation of the existing Eastbound Bridge navigational lighting system.
- Replacing all navigational lighting on the Eastbound William Preston Lane Bridge
- Replacing existing conduit, junction boxes, and wiring as required between the transformer assemblies and navigational lights.
- The work will be from the west deck girder at Pier 1 to the last navigational lights on Pier 41 as shown on the Plans.
TIS Duties for the MDTA Misc. Suspension Span Bay Bridge Rehabilitation
True Inspection Services (TIS) provides Construction Management, Administration, and Inspection Services. TIS also provides a variety of managerial services including ICPM/CPM schedule review, budget management, facilitates monthly progress meetings, holds formal partnering meetings, monthly and quarterly safety inspections, force account tracking, change order processing and mitigation. Additionally, TIS provides oversight of the quality control inspection program and staff through all phases of construction.
Andy Herron, CCM, CHST
Area Engineer
Mr. Herron is a Certified Construction Manager and is currently overseeing the project management for the MDTA Misc. Suspension Span Bay Bridge Rehabilitation Project. Some of his duties include facilitating formal partnering meetings, CPM schedule review, and project assignments. In addition, he drafts and provides recommendations for Change Orders and Supplemental Agreements. Finally, he manages the construction budget and generates monthly expenditure reports and future cost projections for the Deputy Director of Construction.
Similar Projects
Anthony Wayne Bridge Dehumidification
Toledo, OH | 2018 - 2020 | $19M
Let's Work Together. START TODAY!
LOCATIONS
OHIO
605 MIAMI STREET STE 200
URBANA, OH 43078
EASTON TOWN CENTER
4200 REGENT ST STE 200
COLUMBUS, OH 43219
MARYLAND
539 ROCK SPRING RD
BEL AIR, MD 21014
KENTUCKY
7310 TURFWAY RD, STE 550
FLORENCE, KY 41042
SERVICES
CAREERS